Aménagement d’une plateforme de stockage de 20 ha pour LMWP EN
False
Creation of a 20 ha storage platform for LM Wind Power
Brief overview
LM Wind Power, based in the Port of Cherbourg since 2019, manufactures blades for the Haliade X – 14 MW. With the company’s needs for storage prior to dispatch growing, LMWP asked Ports of Normandy to create an extra 20 ha of space for it.
As a result we will be developing a main 30-metre-wide asphalt strip leading to the various storage areas, each of the latter comprising 8.5–9.5 m wide roads at intervals of 60 m.
Useful information
Document(s)
Download
Contact
contact@portsdenormandie.fr
Budget
€2 M were allocated to this project and funded by private financing.
Project schedule
Start date of phase 1 works
Late June 2022
End date of phase 1 works
Mid-July 2022
Start date of phase 2 works
October/November 2022
End date of phase 2 works
November/December 2022